24/7 Emergency Call-Out

Carpentry

Carpentry services for repairs, installations and general building requirements.

About Our Carpentry

Trade Rescue 24/7 provides carpentry services covering repairs and installations, from smaller jobs around the property to work that forms part of a wider building project.

Emergency call-out support is available 24 hours a day, 365 days a year, so help can be arranged whenever the problem happens.

What We Can Help With

  • Door repairs and installations
  • Frames and skirting
  • Kitchen fitting
  • Fitted storage and shelving
  • Timber repairs
  • Emergency boarding and securing

Recent Carpentry

Bedroom Transformation

A bedroom transformation completed by Trade Rescue 24/7 ๐Ÿ”จโœจ

Weโ€™ve given this space a full refurb, including brand-new flooring and stunning full-wall panelling for a clean, modern finish. The panelling completely elevates the room, adding depth, character, and a real touch of class.

Whether youโ€™re looking to refresh a tired bedroom or go for a full makeover, weโ€™ve got you covered from start to finish.

Bedroom wardrobe unit in dated oak finish before refurbishment
Before
Wardrobe and surround repainted in a clean white finish
After
New light wood flooring being laid in the bedroom
During
Bedroom wall with timber panelling battens fixed in place ready for finishing
Before
Completed full-wall panelling painted in soft grey
After
Bedroom mid-works with part-fitted panelling battens and filled joints
Before
Finished bedroom with grey panelled walls, new flooring and wall-mounted TV
After
Completed bedroom showing full-wall grey panelling and new flooring
After

Wardrobe Revitalisation

A bespoke job completed by Trade Rescue 24/7 ๐Ÿ”ง

Weโ€™ve recently designed and fitted a set of custom MDF panel wardrobe doors, made to measure for a perfect fit and a clean, modern finish. Built to suit the space and the clientโ€™s style, these wardrobes are a great way to upgrade both storage and appearance.

If youโ€™re thinking about refreshing your wardrobes or need something tailored to your space, weโ€™re here to help.

Old built-in cupboard stripped out with rubble and exposed plywood in the alcove
Before
Alcove cleared of the old cupboard structure ready for the new wardrobe build
Before
MDF sheet marked out and ready to be cut for the wardrobe doors
During
Cut MDF panels laid out for the door frames
During
MDF door frame with vertical panel battens fitted
During
Pair of completed MDF panel wardrobe doors before painting
During
New MDF wardrobe carcass and shelving fitted into the alcove
During
Finished wardrobe doors primed and ready for hanging
During
Completed made-to-measure MDF panel wardrobe painted in soft pink with open shelving below
After

Window Remodelling

Another property upgraded by Trade Rescue 24/7 ๐Ÿ› 

Weโ€™ve removed two old single-glazed sash windows and replaced them with contemporary uPVC double-glazed units โ€” instantly improving insulation, security, and overall appearance.

A great upgrade for homeowners and landlords looking to reduce heat loss, cut energy bills, and modernise their property without compromising on style.

Clean install, no hassle, and built to last.

Old single-glazed sash window removed leaving an open brick opening
Before
Second old sash window stripped out showing exposed brickwork reveals
Before
New uPVC double-glazed window fitted into the prepared opening
During
Close-up of the window reveal being packed and sealed before making good
During
Both new uPVC double-glazed windows fitted with reveals made good and painted
After

Fireplace Modernisation

Modern transformation completed by Trade Rescue 24/7 ๐Ÿ”ฅ

This customer wanted to update an old brick fireplace and give it a cleaner, more contemporary look. Our team got to work cladding the fireplace with 18mm MDF, creating a sharp, square finish that completely modernises the space.

To finish it off, we installed two spotlights to highlight the feature and add a warm, stylish touch to the room.

Simple changes, big impact โ€” perfect for homeowners and landlords looking to refresh their interiors.

Timber batten cut and shaped ready for the fireplace cladding frame
During
MDF cladding frame built around the old brick fireplace
During
Original brick fireplace arch exposed behind the new MDF framework
Before
Fireplace cladding levelled and checked with a spirit level
During
Two spotlights installed inside the new MDF fireplace recess
During
Fireplace surround part painted with the MDF cladding fitted
During
Completed modern white fireplace with square MDF cladding and log burner
After

Brand New Build

Another great job completed by the team at Trade Rescue 24/7 ๐Ÿ”จ

Our carpentry team have been hard at work on this brand new build, fitting all the timber framework with precision and care. This project included the installation of a 3m x 1m roof lantern, bringing in plenty of natural light and adding a real feature to the space.

We then fully boarded the structure using OSB tongue and groove, finishing it off with a solid 6x2 timber plate all the way around the edge โ€” all set and ready for the fascia installation.

Quality workmanship from start to finish ๐Ÿ’ช

Blockwork walls with timber wall plate fixed around the perimeter
During
Timber roof beams set out over the new blockwork walls
During
Roof joists installed with OSB boards ready to be laid
During
Interior view of the new build with roof joists and timber studwork
During
Internal stud partitions and door opening framed out
During
Roof structure covered over showing the steel beam and timber joists
During
Framed internal rooms and openings within the new build
During
Timber door frame fitted between the framed partitions
During
External view of the new build with roof timbers and edge plate fitted
During
Roof fully boarded with OSB tongue and groove ready for fascia
During
Roof joists sheeted over and protected with tarpaulin during works
During
Close-up of the timber plate fixed to the OSB roof deck
During
Detail of the 6x2 timber edge plate screwed down to the boarded roof
During
Completed roof boarding with the 3m x 1m roof lantern aperture framed out
After
Finished OSB roof deck with the lantern opening, ready for fascia installation
After

Fence Transformation

๐Ÿ”จ Another fencing transformation completed by the team at Trade Rescue 24/7 ๐Ÿ”จ

Our carpentry team ripped out this old, outdated fence and replaced it with a brand-new pressure-treated 6.5ft fence with protected posts secured below ground level for added strength and durability.

To finish it off, we topped it with a beautiful 2ft high trellis, giving the garden extra privacy while keeping a stylish look ๐ŸŒฟ

  • โœ… Old fence removed
  • โœ… New pressure-treated fencing installed
  • โœ… Protected posts for long-lasting support
  • โœ… Decorative trellis finish

Another happy customer and another garden transformed!

Old weathered garden fence overgrown with ivy before replacement
Before
Rotten timber fence panels stacked and leaning beside the shed
Before
Old mossy side gate and worn fencing before the transformation
Before
First new pressure-treated fence panel installed and braced
During
Timber post treated with protective bitumen paint before going below ground
During
New posts and rails fixed in place with panels being levelled
During
Run of new pressure-treated fencing installed across the garden
During
New fence panels fitted along the side alley with posts braced
During
Newly built timber gate hung between the finished fence posts
After
Completed 6.5ft pressure-treated fence topped with 2ft trellis
After
Wide view of the completed pressure-treated fence with trellis top in bright sunshine
After

Door Fitting Makeover

Another productive day for Trade Rescue 24/7 ๐Ÿ”จ๐Ÿšช

7 doors hung today for one of our regular customers in Dartford โ€” all fitted and finished to a high standard ๐Ÿ‘Œ

Always grateful for the repeat business and continued support from our loyal customers.

Landing with old varnished pine doors before replacement
Before
Old stained timber door at the top of the stairs
Before
Two dated pine doors on the upstairs landing
Before
Old orange pine door in the hallway before being changed
Before
Glazed timber kitchen door before replacement
Before
Original glazed hallway door before the new doors were hung
Before
New unfinished timber door hung and being fitted
During
Newly hung white cottage-style door at the end of the hallway
After
Freshly fitted white panelled door with new frame and ironmongery
After
Completed white cottage door hung in the bedroom doorway
After
Two new white cottage-style doors fitted side by side on the landing
After
New white panelled bedroom door within its timber frame
After
Newly hung white door at the top of the staircase
After
Three freshly fitted white cottage doors across the landing
After

Kitchen Renovation

โœจ Another beautiful kitchen completed by the team at Trade Rescue 24/7 โ€“ Tiling Division! โœจ

Today we finished this stunning kitchen splashback using glossy blush pink subway tiles, perfectly paired with sleek grey units and rose gold finishes ๐Ÿ‘Œ

A clean, modern look that really brightens the space and adds a touch of elegance to the heart of the home ๐Ÿก

Great attention to detail from the team as always โ€” ready for the customer to enjoy!

  • ๐Ÿ“ Kitchen splashback tiling
  • ๐Ÿ›  Professional finish
  • ๐Ÿ“ž Trade Rescue 24/7 โ€“ Tiling Division
Bare plaster kitchen wall above the worktop before tiling
Before
Kitchen sink run with untiled pink plaster splashback area
Before
Grey kitchen units with bare walls ready for the new splashback
Before
Corner of the kitchen showing patched plaster before tiling
Before
Utility side of the kitchen with untiled walls before works
Before
Blush pink subway tile splashback fitted behind the hob
After
Glossy pink metro tiles finished around the sockets
After
Completed pink tiled splashback along the appliance run
After
Finished tiling beside the kitchen window and sink
After
Close-up of the completed blush pink subway tile splashback above the hob
After
Full kitchen splashback and hob area with blush pink subway tiles and grey units
After

Pegboard Installation

๐Ÿ”ง Another same-day job completed by Trade Rescue 24/7! ๐Ÿ”ง

We received a call this morning from a customer in Kidbrooke looking to have an IKEA pegboard securely fitted โ€” and by this evening the job was completed and ready to use. โœ…

A nice, neat installation with everything fixed securely and the area left clean and tidy.

  • ๐Ÿ“ Kidbrooke
  • ๐Ÿ“ž Called in the morning โ€” completed the same day

No job too small. Whether itโ€™s hanging shelves, fitting TVs, carpentry, plumbing, electrical work or general property maintenance, Trade Rescue 24/7 has you covered.

Trade Rescue 24/7 installer fitting an IKEA pegboard to a wall in Kidbrooke
During
Neatly installed white IKEA pegboard fixed securely to the wall
After

Pub Refurbishment

๐Ÿป PUB REFURBISHMENT COMPLETED โ€“ ABBEY WOOD ๐Ÿป

Another project completed by the Trade Rescue 24/7 team at a local pub in Abbey Wood.

Our work included:

  • ๐Ÿ”จ New timber framing
  • ๐Ÿšช Forming a new doorway opening
  • โš’ Bespoke carpentry and cladding
  • ๐Ÿงฑ Alterations ready for the finishing trades
  • ๐Ÿงน Full clean-up on completion

Itโ€™s been great watching this area take shape and helping bring the customerโ€™s plans to life.

Trade Rescue 24/7 โ€“ Building & Refurbishment Specialists

  • ๐Ÿ“ž Emergency call-outs
  • ๐Ÿ  General building work
  • ๐Ÿ”จ Refurbishments and alterations
  • โš’ Carpentry and property maintenance
Commercial interior with timber sole plate laid out for new partition framing
Before
New timber stud partition frame erected and plumbed into position
During
Timber stud partition with doorway opening framed out
During
Second stud partition line started across the open plan area
During
Partition frames meeting at a corner with doorway opening formed
During
Multiple timber partition frames lined up across the commercial space
During
Partition framing nearing completion with overhead noggins fixed
During
Close-up of timber sole plate fixed to the floor at a partition corner
During
Timber base plate running along the wall ready for partition framing
During
Plasterboard cladding being fixed to the timber stud partitions
During
Timber framing built up to the ceiling grid with boarding started
During
Stud partitions forming a new room with boarded return wall
During
Corridor framing with plasterboard fixed to one side
During
Full height timber framing and head plates forming the new layout
During
New sole plates set out on the floor for the next partition
During
Framed doorway opening through to the main pub area
During
Plasterboard partition wall boarded and ready for finishing
During
Insulation boards fitted between timber studs on the external wall
During
Insulated and part boarded corridor walls during the refurbishment
During
OSB and plasterboard cladding fixed to the new feature wall
During
Timber ceiling joists and insulated stud walls formed in the new corridor
During
Carpenter fitting out the boarded corridor during the pub refurbishment
During
Finished boarded corridor with clean plasterboard walls and exposed joists
After
Completed store room boarded out and ready for decoration
After
Smooth boarded wall with fixings ready for filling and finishing
After
Structural opening propped and blockwork exposed ready for the new doorway
After
New structural opening formed through the blockwork wall
After
Solid oak bar top fitted with a curved end detail
After
Finished oak bar counter running the length of the servery
After
Newly formed doorway opening through to the adjoining room
After
New structural opening formed with concrete lintel installed above
After
Doorway opening plastered around the reveals and lintel
After
Freshly plastered reveal alongside the newly boarded store room
After
Completed doorway opening plastered and ready for the new door
After
Finished opening through to the boarded corridor with plastered reveals
After

โ˜• Commercial Refurbishment ๐Ÿ› ๏ธ

Trade Rescue 247 team completed this bespoke counter refurbishment for Hill Top Coffee Shop in Shooterโ€™s Hill.

We stripped back the existing counter, altered and rebuilt the framework, then finished it with modern oak-effect slatted panels and a stained timber countertop.

The angles and returns made this one a proper brain-teaserโ€”but, as always, we worked it out and got the job completed! Weโ€™re really pleased with the finished result. ๐Ÿ‘Œ๐Ÿผ

Trade Rescue 247 undertakes domestic and commercial building, refurbishment and repair work across London and the surrounding areas.

Existing counter stripped back to the bare timber framework before rebuild
Before
Old counter framework dismantled and removed ready for the new build
During
Counter area cleared with new framework layout marked on the floor
During
New counter carcass built up with light oak-effect panels and metal trim
During
Slatted oak-effect front panels fitted to the rebuilt counter
During
Counter top and slatted cladding being fixed into place
During
Front counter nearing completion with slatted panels and worktop installed
During
Completed bespoke counter with oak-effect slats and stained timber top
After

Need Emergency Assistance?

Trade Rescue 24/7 is available 24 hours a day, 365 days a year.

View All Services